Where the soil report calls for piers, each hole is measured for position, width and depth while it is still open.

  • While the holes are open, before concrete arrives
  • About 1 hour on site
  • Report within 24 hours
Request your quotePick the inspection and leave your number. We ring back the same working day.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage1 of 7
When to bookWhile the holes are open, before concrete arrives
Time on siteAbout 1 hour on site
Inspected againstAS 2870, AS 3600, the geotechnical report and the engineer's footing design

What is included in a Kalkallo bored piers inspection

  • Pier layout compared with the engineering plan
  • Hole diameter measured
  • Depth measured against the drawing
  • Base clear of spoil and water
  • Founding material compared with the soil report
  • Pier count matches the plan
  • Reinforcement cages, where specified
  • Cage cover and centring
  • Excavation edges stable
  • Spoil kept away from open holes
  • Site safety around open holes noted
  • Photographs of each pier group
Why it matters here

Bored piers inspections on Kalkallo builds

Parts of Kalkallo sit on basalt with clay above it, and some lots carry fill from estate earthworks. When an engineer specifies piers, the depth into sound ground is the number that matters, and nobody can measure it once concrete is in.

What we find at this stage in Kalkallo

  • Pier positions checked against the engineering plan
  • Diameter measured hole by hole
  • Depth taped against the drawing
  • Loose spoil or water in the base
  • Founding material compared with the soil report
Bored piers drilled across the lot in the positions marked on the engineering plan, Kalkallo
Bored piers drilled across the lot in the positions marked on the engineering plan
Pier hole measured against the diameter called for on the engineering drawings, Kalkallo
Pier hole measured against the diameter called for on the engineering drawings
Pier excavation checked with a tape against the depth on the engineering drawings, Kalkallo
Pier excavation checked with a tape against the depth on the engineering drawings

The other stages of a Kalkallo build

  1. Slab pre-pour inspection in Kalkallo2Slab pre-pourThe day before concrete, steel and pods all in
  2. Frame inspection in Kalkallo3FrameTrusses fixed, before wrap and roof covering
  3. Lock-up (pre-plaster) inspection in Kalkallo4Lock-up (pre-plaster)Roof, windows and brickwork done, before plaster
  4. Fixing inspection in Kalkallo5FixingPlaster, doors and cabinets fitted, before paint
  5. Waterproofing inspection in Kalkallo6WaterproofingMembrane cured, before the tiler starts
  6. Pre-handover (PCI) inspection in Kalkallo7Pre-handover (PCI)At practical completion, days before handover

All construction stage inspections in Kalkallo →

Guides

Construction stage guides for Kalkallo

All guides →

Book a bored piers inspection in Kalkallo

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Bored piers inspections in Kalkallo: common questions

Does every Kalkallo house need piers?

No. Many lots go straight to a waffle raft slab. Piers appear where the engineer needs to reach firmer ground, often on deeper clay or filled areas.

What is a pier inspection measured against?

The engineering drawings for your lot, read with AS 2870.

How long does it take?

Usually under an hour on site, depending on the number of piers.

What if the concrete is already poured?

Then the piers can no longer be inspected. Ask the supervisor for the drilling date early.

Do you certify the piers?

No. We report what we measured against the drawing. Certification belongs to the engineer and the building surveyor.

What does it cost?

Use the instant quote online. Pier inspections are often booked together with the slab visit.

CallGet a Free Quote