Kalkallo Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Waterproofing inspection in Kalkallo

The membrane in each wet area is checked in the gap between the waterproofer leaving and the tiler arriving.

  • Membrane cured, before the tiler starts
  • About 1 hour on site
  • Report within 24 hours
Request your quotePick the inspection and leave your number. We ring back the same working day.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage6 of 7
When to bookMembrane cured, before the tiler starts
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Kalkallo waterproofing inspection

  • Membrane coverage to floors and walls
  • Upturn heights at walls
  • Damage or punctures in the membrane
  • Membrane protected from traffic
  • Bond breakers at corners and pipes
  • Penetrations sealed through the membrane
  • Waterstops at doorways
  • Falls in niches and seats
  • Floor waste and puddle flange
  • Bath hob and cavity clean
  • Junctions with wall flashings
  • Each wet area photographed
Why it matters here

Waterproofing inspections on Kalkallo builds

A failed shower membrane is one of the costliest defects a young home can have, because it is only found once water has already done damage. On Kalkallo jobs we have recorded membranes damaged before tiling and left exposed to site traffic.

What we find at this stage in Kalkallo

  • Membrane damaged before tiles go down
  • Membrane unprotected from trades
  • Waste pipes without bond breakers
  • Niches and seats without fall
  • Doorway waterstops not continuous
Fresh membrane left exposed to foot traffic and site damage before tiling, Kalkallo
Fresh membrane left exposed to foot traffic and site damage before tiling
Membrane painted over removable plumbing caps, leaving gaps once they come off, Chelsea, Kalkallo
Membrane painted over removable plumbing caps, leaving gaps once they come off, Chelsea
Sample findings

Sample defects found during our waterproofing inspections in Kalkallo

Annotated findings from Waterproofing inspections.

Floor membrane damaged and needing repair before any tiles go down, found during a waterproofing inspection in Kalkallo
Floor membrane damaged and needing repair before any tiles go down
Shower wall membrane punctured in many places by mechanical fixings, found during a waterproofing inspection in Chelsea
Shower wall membrane punctured in many places by mechanical fixings, Chelsea
No bond breaker around the toilet and bath waste pipes, found during a waterproofing inspection in Chelsea
No bond breaker around the toilet and bath waste pipes, Chelsea
Shower niche base falling back towards the wall instead of out, found during a waterproofing inspection in Chelsea
Shower niche base falling back towards the wall instead of out, Chelsea
Doorway waterstop not joined to the wall flashing at the door jambs, found during a waterproofing inspection in Chelsea
Doorway waterstop not joined to the wall flashing at the door jambs, Chelsea

The other stages of a Kalkallo build

  1. Bored piers inspection in Kalkallo1Bored piersWhile the holes are open, before concrete arrives
  2. Slab pre-pour inspection in Kalkallo2Slab pre-pourThe day before concrete, steel and pods all in
  3. Frame inspection in Kalkallo3FrameTrusses fixed, before wrap and roof covering
  4. Lock-up (pre-plaster) inspection in Kalkallo4Lock-up (pre-plaster)Roof, windows and brickwork done, before plaster
  5. Fixing inspection in Kalkallo5FixingPlaster, doors and cabinets fitted, before paint
  6. Pre-handover (PCI) inspection in Kalkallo7Pre-handover (PCI)At practical completion, days before handover

All construction stage inspections in Kalkallo →

Guides

Construction stage guides for Kalkallo

All guides →

Book a waterproofing inspection in Kalkallo

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Kalkallo: common questions

What does a waterproofing inspection cover?

Membrane coverage and heights, corners and junctions, penetrations, bond breakers, waterstops and falls in each wet area.

Which standard applies?

AS 3740, waterproofing of domestic wet areas, with the National Construction Code.

Can it be done after tiling?

No. Once tiled, the membrane cannot be seen and leaks show up only later.

Is it worth it on a volume build?

A shower leak can damage framing and floors long before it is noticed. A short visit at the right time is cheap protection.

Is the shower flood tested as part of this?

No. The inspection is visual and measured. Testing belongs to the waterproofer and builder.

Can it be combined with fixing?

Yes, where the timing lines up, but separate visits suit most programs better.

CallGet a Free Quote