Kalkallo Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Fixing inspection in Kalkallo

Plaster, doors, cabinetry and trims are in, the painter has not started, and alignment problems are still easy to fix.

  • Plaster, doors and cabinets fitted, before paint
  • 1 to 2 hours on site
  • Report within 24 hours
Request your quotePick the inspection and leave your number. We ring back the same working day.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage5 of 7
When to bookPlaster, doors and cabinets fitted, before paint
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the Guide to Standards and Tolerances 2015 and your contract selections

What is included in a Kalkallo fixing inspection

  • Walls plumb and flat to tolerance
  • Plaster joints and corners
  • Cornices and trims fitted
  • Doors hung with even margins
  • Door hardware fitted
  • Cabinets level and aligned
  • Stair treads and handrails
  • Flashings sealed against cladding
  • Roof penetration flashings
  • Gutters and downpipes in place
  • Articulation joints cleared
  • Window reveals and sills
Why it matters here

Fixing inspections on Kalkallo builds

At fixing stage on Kalkallo homes we have measured plastered walls out of plumb, found flashings left unsealed against cladding and roof penetrations badly flashed. Once painted, every one becomes harder to argue about.

What we find at this stage in Kalkallo

  • Walls out of plumb beyond 5mm
  • Flashings unsealed against cladding
  • Roof penetration flashings poorly fitted
  • Handrails left rough
  • Temporary downpipes missing
Stair handrail left rough, needing a proper sand before paint goes on, Kalkallo
Stair handrail left rough, needing a proper sand before paint goes on
Articulation joint packed with mortar and rubbish that needs clearing out, Kalkallo
Articulation joint packed with mortar and rubbish that needs clearing out
No temporary downpipes fitted, so roof water is not being carried away mid-build, Kalkallo
No temporary downpipes fitted, so roof water is not being carried away mid-build
Sample findings

Sample defects found during our fixing inspections in Kalkallo

Annotated findings from Fixing inspections.

Plastered wall out of plumb by more than the 5mm tolerance, found during a fixing inspection in Kalkallo
Plastered wall out of plumb by more than the 5mm tolerance
Flashing against the wall cladding left unsealed, an easy path for water, found during a fixing inspection in Kalkallo
Flashing against the wall cladding left unsealed, an easy path for water
Roof penetration flashing poorly fitted and needing rework to keep water out, found during a fixing inspection in Kalkallo
Roof penetration flashing poorly fitted and needing rework to keep water out
Stair handrail left rough, needing a proper sand before paint goes on, found during a fixing inspection in Kalkallo
Stair handrail left rough, needing a proper sand before paint goes on

The other stages of a Kalkallo build

  1. Bored piers inspection in Kalkallo1Bored piersWhile the holes are open, before concrete arrives
  2. Slab pre-pour inspection in Kalkallo2Slab pre-pourThe day before concrete, steel and pods all in
  3. Frame inspection in Kalkallo3FrameTrusses fixed, before wrap and roof covering
  4. Lock-up (pre-plaster) inspection in Kalkallo4Lock-up (pre-plaster)Roof, windows and brickwork done, before plaster
  5. Waterproofing inspection in Kalkallo6WaterproofingMembrane cured, before the tiler starts
  6. Pre-handover (PCI) inspection in Kalkallo7Pre-handover (PCI)At practical completion, days before handover

All construction stage inspections in Kalkallo →

Guides

Construction stage guides for Kalkallo

All guides →

Book a fixing inspection in Kalkallo

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Kalkallo: common questions

What is checked at fixing?

Plaster finish and flatness, cornices, doors and hardware, architraves and skirtings, cabinetry, stairs and handrails, and the outside flashings and roof.

Why before paint?

Paint hides joint and plaster defects and makes trades reluctant to redo work. Before paint, a fix is quick.

Which tolerances are used?

The Guide to Standards and Tolerances 2015, for example the limits on walls out of vertical.

Do you look at the roof at fixing?

Yes, from the ground and roof edge where safe, because flashings and penetrations are often finished around now.

How long does it take?

About one and a half hours for a typical Kalkallo house.

Is fixing worth booking if I have PCI?

It catches items that are costly to put right after painting, so it reduces the length of your PCI list.

CallGet a Free Quote