Building a new home in Kalkallo: estates, stages and the defects that repeat

Nearly all new building in Kalkallo sits east of the Hume Freeway in Cloverton, with Kallo adding homes north of Donnybrook Road near Merri Creek. Both are volume builder territory, with lots typically in the 300 to 450 square metre range and a mix of single and double storey designs. The building surveyor signs off the permit stages, and that is not the same as an independent check of workmanship for you.

Where the lots are

Cloverton, the former Lockerbie land, is planned for around 11,000 homes and covers most of the active streets. Kallo is a much smaller estate planned for about 730 homes beside Merri Creek. The original township around the old Hume Highway alignment is mostly larger rural lots with little new building.

How a build runs here

Slab, frame, lock-up, fixing and handover follow each other with little slack, and trades move between several houses on the same street. That speed is why items get covered before anyone looks at them.

What we raise most

Top bars and cover at slab, bracing and truss bearing at frame, cut bracing and crowded services at lock-up, and water details at the wall base at handover.

Which visits to choose

Frame and PCI if you can only have two. Add slab on the reactive clay, and lock-up if the house is double storey with ducted heating and lots of services in the walls.

Talk to the supervisor early

Tell your site supervisor at the start that each stage will be independently inspected, ask for dates as soon as they are known, and confirm each visit in writing.

More about Kalkallo

Written by our local inspection team from work carried out in Kalkallo. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

Guides for Kalkallo owners and buyers

All guides →

Book a building inspection in Kalkallo

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Building a new home in Kalkallo: common questions

Which estate is most of Kalkallo?

Cloverton, by a wide margin. Kallo and the original township make up the rest.

Which stage inspections matter most?

Frame and PCI, with slab close behind on reactive clay.

How long does a Kalkallo build take?

Usually around nine to fourteen months depending on size, builder and weather.

Does the building surveyor protect me?

The surveyor checks compliance at set points for the permit. An independent inspector writes a workmanship list for you.

Am I allowed to walk my own Kalkallo site?

Yes, by arrangement with the supervisor. Walk it often and take dated photos.